HMCTS, Birmingham
Sitec were appointed to undertake the recently completed fit-out of the HMCTS’ Digital Hub in Birmingham City centre.
Extensive works were required to adapt the existing air conditioning system while integrating new kit to be fully controllable in each office. A new fresh air system was installed to serve all office areas. Structured cabling and small power into new floor boxes were installed throughout and cable managed to desktops via modules. High specification acoustic double glazed partitioning and doors were constructed to form the offices with bespoke manifestation design applied for additional privacy. Seventy new work stations were installed, along with soft seating, lockers and football table.